Pitt HomeFind PeopleContact Us
School of EngineeringDistinguished 2006

Benedum Hall Transformation

Transformation Timeline and Project Overview

 

Current renovations:

  • The sub-basement, basement, and second floor have been (mostly) vacated for construction. Those offices have moved to other places in Benedum, Posvar, Cathedral of Learning, and the Center for Bioengineering. At the end of 2008, more of the basement will be vacated to begin renovation of the floor for the library and classrooms.

  • The Mascaro building is scheduled to be completed by Summer 2009.

  • The auditorium is scheduled to be completed by Summer 2009. (Conversion of space into classrooms.)

  • The construction of the Holzman Learning Center (10th floor) is complete and classes will be scheduled there this fall.

 

Upcoming renovations:

  • The new ground floor will be finished in Fall 2009 and will be converted into classrooms, a café, student organizations, and the library.

  • The sub-basement will be converted into the new mezzanine level and will become a computing lab and the library stacks. This is scheduled to be completed sometime during spring 2009.

  • Renovations of the first floor will begin in fall 2009 through spring 2010.

  • Renovations of the fourth floor will begin late 2009 through spring 2010.

  • Renovations of the fifth floor will begin in spring 2010 through fall 2010.

  • Phase II (floors 6-12) will begin shortly after.

 

 

Transformation

     

Show Your Support

Name a classroom, lab office, or public area to show your commitment to Pitt Engineering.

You are using a browser that does not support current Web standards. Although this site is viewable in all browsers, it will look much better in a browser that supports web standards.